Use the 31 quiz questions to prepare yourself and test whether you know the subject matter.
Buy the quiz questions and be prepared for your next test.
Add to cartThe application of the Fourth Industrial Revolution are
Smart sensors, Cyber-physical systems, Data analysis
input text value
.....is a technology concerned with the use of computer systems to assist in the creation, modification, analysis, and optimization of a design.
…… is a technology concerned with the use of computer systems to analyze CAD geometry, allowing designers to simulate and study how the product will behave so that the design can be validated, refined and, optimized.
…… is the use of computer systems to plan, manage and control the operations of manufacturing plant through either direct or indirect computer interface with the plant’s production resources.
is practicing engineering with the inclusion of natural system as a fundamental consideration that includes design for sustainability (DFS), design for environment (DFE) and design for life cycle (DFLC).
If you are a customer in a maintenance tool shop and you choose the tool according to some requirements. What is this process called?
Buy the quiz questions and be prepared for your next test.
Add to cart
Do you prefer to learn the quiz questions from paper? Then download the 31 questions as PDF.
Add to cart
Earn money by making quiz questions and learn directly for your upcoming test.
Create quizFast Quiz on all Cad - Cam (Design and manufacturing information )
The first industrial revolution occurred between
1750 ~ 18501st industrial revolution achievements were
Mechanization, Steam, waterpowerThe application of the Fourth Industrial Revolution are
Smart sensors, Cyber-physical systems, Data analysis.....is a technology concerned with the use of computer systems to assist in the creation, modification, analysis, and optimization of a design.
CAD…… is a technology concerned with the use of computer systems to analyze CAD geometry, allowing designers to simulate and study how the product will behave so that the design can be validated, refined and, optimized.
CAE…… is the use of computer systems to plan, manage and control the operations of manufacturing plant through either direct or indirect computer interface with the plant’s production resources.
CAMis practicing engineering with the inclusion of natural system as a fundamental consideration that includes design for sustainability (DFS), design for environment (DFE) and design for life cycle (DFLC).
Green DesignIf you are a customer in a maintenance tool shop and you choose the tool according to some requirements. What is this process called?
Validation....is done by engineering to design specifications at each
stage.
.........contain validation and verification
..................include (e.g., machining, casting, welding,
forming, dimensioning, new technologies)
......... known as mechanical working processes,
are primary shaping processes.
.............. defined as plastic deformation of metals and alloys at a temperature below the re-crystallization temperature for that metal or alloy
.......... include (e.g., inventory, aggregate planning, MRP, theory of constraints, sequencing)
It’s a system based on a forecast or projection of customer demand.
It’s a system which the creation of a product or service is tied to customer
orders
In Taylor Tool Life Formula, n = an index related to cutting tool material, If n = 0.1 to 0.5 then what’s tool material?
It's a method used in reducing delays during jobs,
by equation = (What + How).
Planning Backlog should be …. to …. weeks.
Backlog is done by ……… and shows how much work is ready to be performed.
........ ......... .........Three Japanese words were the base to Taiichi Ohno in making lean machine
Lean Six Sigma is one of the most powerful problem-solving and continuous improvement methodologies because Lean is focused on ….
and Six Sigma is focused on
The main goal of lean is to ...............
........is a volume of chips removed in 1 minute in metal cutting
At the endurance stress , the product can perform about ..…. Cycles
The ratio between endurance stress and ultimate stress is …...
The steel’s melting point decreases by reducing ....... content
.......is Cycle Time is the average amount of time between an order being placed and when it is being executed
Time of cutting can be calculated by equation ....
The tool life is affected by:
The Material Removal Rate ( MRR ) is calculated by equation