Use the 16 quiz questions to prepare yourself and test whether you know the subject matter.
Buy the quiz questions and be prepared for your next test.
Add to cartDesigning and planning a facility includes four main phases:
Before any of these phases begin:
And this should consist of:
pre-design, design, construction and pre-operation
a facility design committee should be formed
various levels of professionals including but not limited to, administrators, facility management personnel, an architect, a contractor, a lawyer, a representive number of prospective users of the facility and a personal trainer
input text value
PRE-DESIGN PHASE
- the committee conducts:
- and then the committee creates:
Part of the feasbility study:
If results of needs analysis and feasibility study are positive the committee conducts:
the committee should state the major objective of the new facility and write minor objectives such as:
- a needs analysis and feasibility study
- master plan, selects an architect and outlines possible future expansion and alternative uses of areas within the facility
cost, facility location, program needs, projected usage of the facility, SWOT-analysis
a master plan, which will explain in detail the project goals and procedures needed to achieve those goals
equipment requirements
input text value
DESIGN PHASE
- The design phase takes:
- The final result should be a:
- and this should take into account:
- several months
- detailed blueprint of the facility design
- equipment and facility spacing and local health, safety and legal codes
input text value
CONSTRUCTION PHASE
- The construction phase takes:
- Throughout the construction phase he facility design committee should:
- the majority of the time
- tmonitor to ensure that the master plan and project deadlines are being fulfilled in a timely manner and also oversee the construction
input text value
Facility guidelines
- passageways:
- Emergency first aid kit and AED:
- Temperature:
- Humidity level:
- Ventilation system:
- Music and noise:
- passageway: 36 inches and hallways/circulation passages: 60 inches
- nearby, AED within 1,5 min walk (height wheelchair)
- 72-78 F (22-26 C68-72 F (20-22 C)
- 50% and no higher 60%
- 8-10 air exchanges/hour (12-15 optimal)
- 70 decibels, dont exceed 90 decibels
input text value
RT room guidelines
- Location:
- Staff to client ratios:
- Ceiling height:
- Windows:
- Mirrors:
- Floor:
- ground floor, near lockerrooms
- middle school 1:10, secondary 1:15, older: 1-20
- 12-14 feet or 3,7-4,2 m
- 20 inches (51 cm) above the floor
- 20 inches (51 cm) above the floor, equipment 6 inches away
- rubber mats provide cushion and durability, dark colors (wood floor for olympic platforms: smooth, flat, better contact)
input text value
Evaluating exercise equipment involves 3 phases:
1.
2.
3.
In addition to this process 2 other planning tools are used:
1.
2.
highest priority=
1. developing functional criteria for the equipment (WHICH)
2. evaluating the specifications and effectiveness of the equipment (HOW MANY)
3. evaluating the manufacturers business practices (WHERE FROM)
1. tentative floor plan= reflects major and minor objectives of the facility design
2. priority list= based on facility's needs analysis
safety and prevention of injuries
input text value
Buy the quiz questions and be prepared for your next test.
Add to cartDo you prefer to learn the quiz questions from paper? Then download the 16 questions as PDF.
Add to cartEarn money by making quiz questions and learn directly for your upcoming test.
Create quizsamenvatting, oefenvragen hoofdstuk 24 van het NSCA boek, minor pt aan de hva.
16 questions
English
11-16-2021
HBO / Hogeschool van Amsterdam / Voeding en Diëtetiek / Minor Personal Trainer